Kraus-Anderson has accomplished development on six assignments for the White Bear Lake University District, in White Bear Lake, Minnesota.  The tasks are component of a very long-array facilities system that in total contains 16 district assignments, all funded by a 2019 $326 million university bond referendum, the biggest in Minnesota heritage.

The tasks, which deal with the district’s enrollment development and creating routine maintenance, depict the first period of a construction strategy that is expected to choose location in phases until the 2024-25 university calendar year.

The concluded assignments include White Bear Lake South Campus, Matoska Intercontinental, and Lincoln, Vadnais Heights and Willow Lane Elementary Schools and a Transportation Creating.

  • White Bear Lake Region High School – South Campus (will be converted to a center school) (3551 McKnight Street North, White Bear Lake)
    The $5.2 million, 16,900-square-foot challenge capabilities a new 14,500-square-foot gym, which includes a new entrance, vestibule, restrooms and storage. The rework bundled constructing a corridor between the new addition and the current gyms, and the set up of a new walk-in freezer in the kitchen area. Designed by MLA Architects.
  • Lincoln Elementary (1961 6th Street, White Bear Lake)
    The $8.4 million, 26,801-sq.-foot expansion characteristics a new health club, storm shelter area, convention place and workplaces. The job included renovations to the cafeteria, kitchen area, media heart and bogs, as nicely as ADA improvements in the restrooms. The job also incorporated a new parking lot, bus loop, asphalt, curbs, gutters and landscaping. Designed by Wold Architects and Engineers.
  • Matoska Worldwide (2530 Spruce Pl., White Bear Lake)
    The $2.2 million, 11,000-square-foot undertaking additional two new classrooms, flex room, lockers, entrance and corridor. Renovations were being produced to the mastering commons, lecture rooms and bathrooms, as nicely as ADA enhancements in the restrooms.  A new wander-in freezer also was extra to the kitchen.  Designed by Wold Architects and Engineers.
  • Willow Lane Elementary – 3575 Willow Ave., White Bear Lake
    The $2.7 million, 3,775-square-foot challenge involved a new addition to the media center and reworked the kitchen area, storage regions and loos. as well as ADA advancements in the restrooms. Created by Wold Architects and Engineers.
  • Vadnais Heights Elementary School – 3645 Centerville Rd., White Bear Lake
    The $2.7 million, 7,100-sq.-foot challenge integrated a new routine maintenance addition and renovations to the kitchen area, bogs and understanding commons, as effectively as ADA advancements in the restrooms.  Designed by Wold Architects and Engineers.
  • Transportation Facility – 13411 Fenway Blvd North, Hugo
    A new $9 million 12,900-square foot transportation facility will house, manage and handle the district’s transportation automobiles and employees.